• Nougat@fedia.io
    link
    fedilink
    arrow-up
    29
    arrow-down
    1
    ·
    4 days ago

    Someone early on in the process made a typo in a form somewhere, then:

    I get paid to process orders, not proofread I get paid to manufacture the sign, not proofread I get paid to package the sign for shipping, not proofread I get paid to put the sign up, not proofread

    And good for all of them, they’re right. Quality control should be paid for, and if you’re not being paid to do quality control, don’t fucking do it.

    • halcyoncmdr@lemmy.world
      link
      fedilink
      English
      arrow-up
      5
      ·
      4 days ago

      This exactly.

      The fact the contractor is paying means somewhere along the line of subcontracting someone typed it in wrong. The contractor likely aren’t the ones making the sign, and there may even be another level of subcontractors each getting more specialized in there if the main contract is for the entire State.